Building FAQs — Asked constantly. Answered straight.

The general questions first, then the service-specific ones. If yours isn't here, the phone works: honest answers are free.

The basics

How do quotes and payment work?

Every quote is detailed and itemised from a real survey — you see what each element costs, and the price only changes if you agree the change first. A booking deposit of around 10% secures your slot, then we invoice against valuations of the work carried out, with the balance at sign-off.

Who applies for building control?

Normally you do, as the property owner — we prepare everything the application needs, liaise with the inspector throughout and book every site visit. If you'd rather we submit it, we can do so for a small admin fee.

What hours do you work?

Site hours are 8am to 5pm, Monday to Friday — reliably. The office runs later, so calls are answered until 6pm on weekdays.

Are you insured and guaranteed?

Public and employer's liability insurance are in force, and workmanship is covered by an insurance-backed guarantee through the Independent Warranty Association. Certificates and details are supplied with your contract.

How do you manage health and safety?

We are SafeContractor approved: SafeContractor assesses our health and safety documentation against its Assessment Standards and re-assesses it every year, and the certificate is recognised across SSIP (Safety Schemes in Procurement). Every site runs under SMSTS-qualified site management with CSCS-carded operatives, and each project gets its own risk assessments and method statements.

Do you use subcontractors?

The core team is ours — carpentry and site management above all. Specialist trades are long-standing partners: Gas Safe engineers for gas, NICEIC electricians for electrics, and specialist stair manufacturers whose staircases our carpenters fit.

Will you tell us if a project isn't worth doing?

Yes, and we do it regularly. If the numbers don't stack up — or a smaller job than ours would serve you better — you'll hear it at the first visit, for free.

Loft Conversions

Do I need planning permission for a loft conversion in Bristol?

Often not — most rear dormers and Velux conversions fall under permitted development, within volume limits. We recommend a lawful development certificate as proof for when you sell; since April 2026 it costs £274. Front-facing dormers, flats and homes in conservation areas usually do need an application, and we tell you which camp you are in at the first visit.

How much does a loft conversion cost in Bristol?

As a guide: Velux room-in-roof from £35,000, dormer from £40,000, hip-to-gable and mansard from £50,000, all plus VAT. The honest answer depends on your roof, the staircase position and the bathroom — which is why we quote from a survey, itemised line by line.

How long does it take?

Eight to twelve weeks on site for a dormer, ten to fourteen for a hip-to-gable or mansard. Design, calculations and any certificate or planning decision add lead time before we start, and party wall notices need one to two months where they apply.

House Extensions

How much does an extension cost in Bristol?

Most projects land between £1,800 and £3,000 per square metre plus VAT. A straightforward 20m² single-storey rear sits at the lower end; big glazing, complicated steels and high-spec kitchens push toward the top. We quote from a survey, itemised line by line.

Do I need planning permission?

Single-storey rear extensions within permitted development limits often don't; two-storey, side and wraparound schemes usually do. We tell you which applies at the first visit, and prepare the drawings with our partner architects where an application is needed.

Can you just do the shell?

Yes. Some clients want weathertight shell only, others want us through to the fitted kitchen. The itemised quote makes the split explicit so you can decide with real numbers.

Renovations

Can you take on a full house, or only rooms?

Both. We run whole-house programmes with phasing that keeps part of the home liveable, and we take on single rooms where the job justifies a proper team — a structural kitchen knock-through more than qualifies.

We've had a leak / an insurance claim. Can you do the reinstatement?

Yes — we have rebuilt homes after tank and appliance leaks, including work referred through claims-management companies, and we are comfortable working to an insurer's scope while telling you honestly where the scope should be challenged.

Do you do small jobs?

Our minimum sensible project is roughly a bathroom. Below that, honest answer: a good local carpenter or handyman will serve you better than our site setup would.

Reinstatement Works

Do you deal with my insurance company?

Not on your behalf — that is the honest answer, and the right one. Handling a claim is a regulated activity; we are builders. What we do is work alongside your loss adjuster and give you an itemised scope and quote written so an adjuster can read it line by line, photograph everything as it comes out and goes back in, and answer the adjuster's technical questions directly. Most of our clients handle the claim themselves, and some appoint their own loss assessor.

Can you start before the claim is settled?

Emergency make-safe work usually needs to happen immediately — insurers expect you to prevent further damage, and waiting makes everything worse. We can make safe and start drying straight away, then agree the reinstatement scope once the adjuster has been. We will always tell you which is which.

How long does drying take?

Longer than people expect — typically several weeks with dehumidifiers and air movers running. We do not close anything up until moisture readings say the structure is dry, because sealing damp into a wall or floor causes a second problem a year later.

Garage Conversions

Do garage conversions need planning permission?

Usually not for attached and integral garages — it is internal alteration plus a new wall in an existing opening. Detached garages, conservation areas and homes with planning conditions on parking can differ; we check before you commit.

How long does it take?

Three to five weeks on site for a straightforward single garage, longer where plumbing for an en-suite or utility is involved.

Will it feel like a proper room?

That is the whole test. Insulation to current standards, matched flooring levels, a proper window and heating sized for the space — the result should be indistinguishable from the rest of the house.

Design & Build

Do you have your own architects?

Design is delivered with our partner architects — practices we work with repeatedly, briefed and coordinated by us, with the build team in the design meetings. You get architectural quality with construction honesty, under one contract.

When does design & build beat hiring an architect separately?

When cost certainty and a single point of responsibility matter more to you than running a competitive tender — typically extensions, conversions and renovations where the budget is real and the timeline matters. For a landmark self-build with an open budget, an independent architect-led route can suit better; we will tell you honestly which side your project falls.

Groundworks

Groundworks-only or the full package — how do we choose?

If you have your own superstructure team, take groundworks-only and we will hand over inspection-ready. If you want one team accountable from dig to weathertight, the combined package removes the riskiest handover in construction — the one at damp-proof course.

Do you work for other builders?

Yes — builders, developers and main contractors. Our health and safety is SafeContractor approved (SSIP), so the paperwork is ready for your pre-qualification. Send drawings, programme and site constraints; you will get an itemised package price and straight answers about capacity.

Energy & Retrofit

Is EPC C actually law for rentals?

Not yet — it is confirmed government policy direction with a 2030 horizon rather than legislation already on the books, and details can still move. That distinction matters, and it is exactly why a costed plan now beats either panic or paralysis: you know your number and can phase the work on your terms.

My EPC is a low C already — am I done?

Maybe not for long. Assessment methodology is expected to change later this decade, and marginal Cs on older ratings can drop when reassessed. If your certificate is old and your score is near the boundary, a fresh look costs little and settles it.

Do you install heat pumps and solar?

Grant-funded measures like heat pumps and solar must be installed by accredited installers under those schemes — so we route them through accredited partners as part of your schedule, while our team delivers the fabric works and coordinates the whole programme.

New Builds & Developers

Will you price from drawings without a site visit?

For a budget figure, yes — good drawings deserve a fast, honest range. For a contract price we walk the site first; it protects both sides from the surprises that wreck programmes.

What size projects do you take?

From single-unit refurbishments and portfolio loft packages up to complete new-build homes. We would rather deliver a four-unit programme flawlessly than overreach on twenty.

Commercial

Can you work around opening hours?

Yes — phasing around trading is normal for us, including early starts, sectional handovers and out-of-hours work where it earns its cost. The programme is agreed before we start, in writing.

Do you work for management companies and freeholders?

Yes, including works across multiple blocks — with the communication discipline that leaseholder-funded projects demand.

Windows & Doors

Can you quote supply-and-fit for windows alone?

Yes — send photos and rough sizes for a budget figure, then we survey properly for the itemised quote. Where a project is glazing-only, we say so plainly and price it that way.

Whose guarantee covers the windows?

Product guarantees come from the manufacturer and are passed to you in writing; our workmanship on the installation is covered by our insurance-backed guarantee through the IWA.

Still got a question?

Ask it the fast way — a call costs nothing and honest answers are the house style.

  1. You tell us the ideaThree quick questions — no essay required.
  2. We call within a working dayA real conversation about what your house can take.
  3. A visit, then an itemised quoteEvery line written down, and only if you want one.